The MWMC Facilities Plan is a large document. There are two volumes the Facilites Plan and Technical Memorandums/Appendixes. The first volume is broken down into sections for easy computer accessibility. The sections are based on chapters, tables, and figures of the plan.
Volume 1 of 2
Facilities Plan
Cover, Table of Contents, Executive Summary
Chapter 1 - Introduction, Purpose and Need
Chapter 2 - Study Area Characteristics
Chapter 3 - Existing Water Facilities
Chapter 4 - Wastewater Characteristics
Chapter 5 - Basis of Planning
Chapter 6 - Development and Evaluation of Alternatives
Chapter 7 - Recommended Plan
Chapter 8 - Financial Strategy
Chapter 9 - Environmental Report
Chapter 10 - References
Volume 2 of 2
Technical Memorandums and Appendixes
Contents
Technical Memorandum
No. 1 Wet Weather Peak Flow Analysis
No. 2 Preliminary Screening
No. 2 Preliminary Screening Attachment A
No. 3 Flow and Load Projections
No. 4 Water Quality Regulatory Update
No. 5 Pretreatment Expansion Alternatives
No. 6 Secondary Treatment Alternatives
No. 7 Secondary Treatment Alternatives
No. 8 Secondary Clarifier Enhancement Alternatives
No. 9 Peak Flow Management Alternatives
No. 10 Disinfection Alternatives
No. 11 Odor Control Enhancement Alternatives
No. 12 Thermal Load Evaluation
No. 13 Projected Flowstream for Solids Processes and Capacity Analysis of Biosolids Treatment Processes and Facilities
No. 14 Biosolids and Effluent Reuse Alternatives Analysis
No. 15 Biosolids and Effluent Reuse Cost Estimates and Recommended Phasing
Appendixes
Appendix A NPDES Permit Including 2002 Permit Renewal Fact Sheet
Appendix A Temperature Management Plan
Appendix A Biosolids Management Plan
Appendix B Department of Environmental Quality Letter
Appendix C Population Projections for 2004 Wastewater Facilities Plan
|